K-BIOCLEANbioclean.ph← BIOCLEAN
한국어
BIOCLEAN KNOWLEDGE · A PRACTICAL INTRODUCTION

Shrimp Aquaculture

Shrimp Aquaculture
Shrimp Aquaculture — AI-generated illustration

Empty pre-stocking tanks, liners, piping and tools

What is managed at this site

Empty tanks & liners

When? Pre-stocking preparation

What? Drain, remove sludge, clean and disinfect, complete required finishing

Check? Residues, water quality, liner condition and stocking criteria

Pipes, nets & equipment

When? Preparation and operational hygiene schedule

What? Treat separately from culture water, check compatibility and rinse as required

Check? Recontamination control, residues and equipment condition

Getting started

  1. Agree on needs and goals with the site manager.
  2. Assess materials, equipment, operating hours and existing methods.
  3. Trial products and procedures in a small area.
  4. Review results and train operators.
  5. Finalize schedules, owners and checks.
  6. Use routine records to track recurrence and improvement.

These are example schedules and procedures; actual conditions are agreed under site policy, product instructions and specialist guidance.

Areas, owners, schedules and handover criteria

AreaExample ownerScheduling basisKey checks
Empty tanks & linersAquaculture technical leadPre-stocking preparationSludge, cleaning, finishing, residue, water quality
Pipes & pumpsEquipment ownerEmpty system and work authorizationMaterials, access, rinsing, recontamination
Nets & toolsZone operatorOperational hygiene planSeparate from culture water; rinse as required
Stocking reviewResponsible technicianPreparation completion reviewAgreed residue/water criteria and records

Roles and schedules are program-design examples, finalized for site organization, product instructions and risks.

Program deliverables to agree

Prepare an inquiryGlossary →