K-STONE S08
Residue Gel
Localized adhesive, gum and paint removal family
Product family for development/supply consultation · confirm formulation, performance and availability
01 · Design direction and development goals
First reduce solid residue with a plastic tool, then treat the remaining film. Solvent versions require ventilation, fire-risk and resin/sealant swelling assessments.
02 · Specific application areas
Event venues, entrances and renovation residue
Assess area, finish, stain depth, existing coatings, adjacent materials and access conditions during work.
03 · Substrates and restrictions
Test natural stone first / manufacturer approval for engineered stone, coatings and sealants
Avoid scratching the surface with metal blades or harsh abrasives.
04 · Use programme
- Check: record stone, finish, coating, soil and SDS; protect adjacent metal, glass and timber.
- Trial: choose an inconspicuous area and use label conditions. Record dilution, dwell time and tools.
- Recover: collect product, soil and wastewater; rinse as directed. Do not leave cleaning chemicals to dry on the surface.
- Evaluate: after full drying, inspect colour, gloss, residue, odour, texture and adjacent materials before approving full application.
Set dilution, dwell time, tools and coverage only after checking the final label, TDS, SDS and material compatibility. The product families on this site include development and supply proposals that are not yet finalized.
05 · Technical documentation and validation
Final SDS, TDS, label, lot information and test results are controlled when the product is finalized. Proposed families do not display invented SDS downloads or certification marks.
- Substrate compatibility
- Colour and gloss change
- Cleaning, protection or restoration performance
- Residue, rinsing and drying assessment
- Packaging stability, storage and transport suitability
06 · Packaging and site-supply consultation
500 mL · 1 L · 5 L · Proposed formats · confirm packaging compatibility and available sizes
Discuss samples and supply conditions after reviewing site soil, area and documentation needs. Container material, closure, label and transport classification follow final product specification.
Discuss product and site needs →