K-STONE G14
Joint Care
Grout and edge cleaning family
Product family for development/supply consultation · confirm formulation, performance and availability
01 · Design direction and development goals
A localized process assessed for both stone and grout compatibility. Separate cleaning from repair decisions for discolouration, cracks and mould-related moisture.
02 · Specific application areas
Stone grout joints, lift thresholds and wall-floor junctions
Assess area, finish, stain depth, existing coatings, adjacent materials and access conditions during work.
03 · Substrates and restrictions
Distinguish cement grout, epoxy grout and silicone before testing
Aggressive brushes and chemicals can erode grout or damage silicone.
04 · Use programme
- Check: record stone, finish, coating, soil and SDS; protect adjacent metal, glass and timber.
- Trial: choose an inconspicuous area and use label conditions. Record dilution, dwell time and tools.
- Recover: collect product, soil and wastewater; rinse as directed. Do not leave cleaning chemicals to dry on the surface.
- Evaluate: after full drying, inspect colour, gloss, residue, odour, texture and adjacent materials before approving full application.
Set dilution, dwell time, tools and coverage only after checking the final label, TDS, SDS and material compatibility. The product families on this site include development and supply proposals that are not yet finalized.
05 · Technical documentation and validation
Final SDS, TDS, label, lot information and test results are controlled when the product is finalized. Proposed families do not display invented SDS downloads or certification marks.
- Substrate compatibility
- Colour and gloss change
- Cleaning, protection or restoration performance
- Residue, rinsing and drying assessment
- Packaging stability, storage and transport suitability
06 · Packaging and site-supply consultation
1 L · 5 L · Proposed formats · confirm packaging compatibility and available sizes
Discuss samples and supply conditions after reviewing site soil, area and documentation needs. Container material, closure, label and transport classification follow final product specification.
Discuss product and site needs →