K-BIOCLEANSTONE CARE & SOLUTIONS
한국어

K-STONE E07

Mineral Remover

Efflorescence and cement-residue treatment for confirmed compatible surfaces

Product family for development/supply consultation · confirm formulation, performance and availability

Mineral Remover
Packaging design concept · final formats not confirmed

01 · Design direction and development goals

First inspect moisture pathways, then test the white deposit locally. If an acid-based process is considered, also protect grout, metals, glass and painted surfaces.

02 · Specific application areas

Textured granite exteriors, porcelain and construction residue areas

Assess area, finish, stain depth, existing coatings, adjacent materials and access conditions during work.

03 · Substrates and restrictions

Confirmed acid-compatible surfaces only / exclude marble, limestone and travertine

Efflorescence can return if leaks or capillary moisture persist.

04 · Use programme

  1. Check: record stone, finish, coating, soil and SDS; protect adjacent metal, glass and timber.
  2. Trial: choose an inconspicuous area and use label conditions. Record dilution, dwell time and tools.
  3. Recover: collect product, soil and wastewater; rinse as directed. Do not leave cleaning chemicals to dry on the surface.
  4. Evaluate: after full drying, inspect colour, gloss, residue, odour, texture and adjacent materials before approving full application.

Set dilution, dwell time, tools and coverage only after checking the final label, TDS, SDS and material compatibility. The product families on this site include development and supply proposals that are not yet finalized.

05 · Technical documentation and validation

Final SDS, TDS, label, lot information and test results are controlled when the product is finalized. Proposed families do not display invented SDS downloads or certification marks.

06 · Packaging and site-supply consultation

1 L · 5 L · 20 L · Proposed formats · confirm packaging compatibility and available sizes

Discuss samples and supply conditions after reviewing site soil, area and documentation needs. Container material, closure, label and transport classification follow final product specification.

Discuss product and site needs →

Related care programme

Compare 14 stone product families · Training and planned maintenance